Seven Clients, Seven Different Questions

What each person on a project actually needs from us, and what we hand them.

Our Specialism

We Specialise in KNX Projects Under RM100,000

Nobody in Malaysia has delivered more. 388 of our 524 systems were contracted below RM100,000, in homes, offices, factories and campuses, with the same topology discipline, documentation and witnessed handover as our largest jobs.

Projects Under RM100k
388
Share of Our Record
74%
Median Contract
RM38,400
Complete Systems From
RM15,000
  • Residential RM24,600 Double-storey terrace, whole home, Setia Alam
  • Commercial RM58,300 Shoplot café, trading through the install, George Town
  • Industrial RM78,500 22-aisle warehouse zoning, Port Klang
  • Higher Education RM62,800 Two 300-seat lecture theatres, Bangi
Who we work with

Seven People Ask Us Seven Completely Different Questions

A developer wants unit economics and a clean handover. An architect wants the plate to disappear into the wall. A consultant wants numbers to put a name against. A plant engineer wants the demand charge down and the line never stopped. A university estates office wants hundreds of rooms that run themselves. An owner wants it to stop breaking. A resident just wants the room to behave. Pick yours.

Property developer working with KNX building automation on a Malaysian project

BULK RESIDENTIAL UNITS DELIVERED

1,400+

An Automation Story Your Launch Can Actually Deliver

Automation helps sell the unit. It then has to survive vacant possession, the defect liability period (DLP) and the handover to the joint management body (JMB). We build the package around all three, not just the show unit.

Repeatable per Unit

One type-unit is engineered and signed off, then replicated with a per-unit ETS sub-project and serialised device schedule.

Follows Your Programme

Released block by block and floor by floor, so commissioning is never the item holding up vacant possession.

A Defect Period Without Arguments

Every unit hands over with a signed test sheet and a photographic panel record, so the cause of any defect is traceable rather than disputed.

Clean JMB Handover

As-built set, ETS backup, device inventory with warranty dates, operating guide and a training session for the building team.

WHAT YOU RECEIVE FROM US

  • Per-unit bill of quantities and cost per unit at design stage
  • Show-unit and sales-gallery scene programming
  • Rollout schedule aligned to your vacant-possession dates
  • Per-unit test sheets and handover certificates
  • JMB documentation pack and training
  • Optional maintenance contract after handover
The sales gallery scene, running the way it will on handover

The sales gallery scene, running the way it will on handover

One type unit, engineered once and replicated per unit

One type unit, engineered once and replicated per unit

The building team trained on the system they inherit

The building team trained on the system they inherit

What the People Who Signed Off the Work Say

“The per-unit test sheets are what won us over. When a defect came in during DLP we could tell in a minute whether it was the device, the wiring or the tenant.”

Y

Yeoh Wei Sheng

Project director, residential developer

“He gave us a plate schedule and sensor positions early enough to put into the drawings. Nothing had to be resolved on site in front of the client.”

N

Nurul Hidayah Zainal

Principal architect

“The topology and loading calculations came with the margin stated. I could put my name on the submission without redrawing anything.”

R

Ravindran Sagadevan

Senior M&E consultant

“They took over an orphaned system, recovered the programming and now hold our maintenance contract. Faults that used to take days close the same day.”

C

Chong Kah Wai

Facilities manager, KL office tower

“The energy report showed exactly which floors were burning power after hours. That single finding paid for the first year of the contract.”

M

Melissa Tan

Operations lead, multi-tenant office

“Floor by floor, with the hotel still trading. Vacant-room set-back showed up on the bill by the second month.”

L

Lim Sze Ying

General manager, boutique hotel

“Industrial-grade engineering at a Malaysian price. The prayer-time and festive scenes matter more to the family than I expected.”

D

Dato Ahmad Faizal

Owner, bungalow, Shah Alam

“The shedding sequence took our maximum demand under target in the second billing month, and every change was made inside a shutdown window.”

I

Ir. Kumaresan Pillai

Plant engineering manager, E&E manufacturer, Penang

“Aisles light up when the forklift turns in and go dark behind it. Three shifts a day, and the lighting bill finally follows the work.”

F

Farah Adlina Rosli

Warehouse operations head, 3PL, Port Klang

“One plate at the lectern that any lecturer can use without training. The hostel shutdown over the semester break alone justified the phase.”

P

Prof. Madya Dr Zulkifli Hassan

Director of development and estates, public university

“All 142 tutorial rooms were done in two semester breaks. Not one class was moved, and the energy report now goes to each faculty monthly.”

T

Tan Mei Ling

Facilities manager, private university, Klang Valley

“Reliable, low maintenance, and when I message on a Sunday the person replying is the engineer who built it.”

D

Dr Liew Poh San

Specialist clinic, Penang

Questions We Are Asked About This

What does a building owner or facility manager receive at handover?

A complete documentation pack, so the system is never tied to us. It contains the ETS project file, the group-address list, as-built single-line and panel drawings, a device schedule with locations, witnessed test sheets, user and administrator guides, and a recorded training session for the facility team. Panel labelling matches the drawings, and the 5-year workmanship warranty starts on the signed handover date.

What do architects actually have to decide, and when?

Three things, early: switch-plate family and finish (affects wall build-up and back-box depth), the control philosophy per room (how many scenes, what each plate does), and ceiling coordination for presence and lux sensors on the RCP. We give you a plate schedule, symbol block for your drawings and a per-room control narrative so the decisions sit inside your normal drawing set.

What do you hand over to the M&E consultant during design?

Bus topology and line-loading calculations, power-supply sizing, riser and containment requirements, DB and panel layouts with device schedules, group-address structure, an interface points list for BACnet/Modbus/DALI, and a testing and commissioning method statement. All in formats you can attach to your submission.

We are a developer. Can you handle a multi-block rollout unit by unit?

Yes. Bulk residential rollouts are run as a repeatable unit template: one type-unit is designed, programmed and signed off, then replicated per unit with a per-unit ETS sub-project, serialised device schedule and a per-unit test sheet. Blocks are released floor by floor to follow your handover programme, and the whole package lands with JMB-ready documentation.

Do you work with universities and colleges?

Yes. Lecture theatres, auditoria, laboratories, libraries, exam halls, faculty blocks, residential colleges and campus streetlighting are one of our four core sectors. Every room type gets a template that is engineered once and cloned, the whole campus follows one group-address standard, and each faculty building is sub-metered so the estates office can report and charge back energy.

Why choose KNX Malaysia over a general electrical contractor?

Because KNX is a specialist discipline: bus topology, ETS programming, integration with air-conditioning, BMS and metering, and witnessed commissioning. A general contractor can pull the cable, but the engineering decides whether the system works, can be expanded and can be maintained by anyone else later. We work alongside your electrical contractor where one is appointed, and every project is designed, programmed and commissioned under one accountable KNX certified engineer, Peter Teh.

All Questions

Book a Design Review

Send the drawings, the problem, or just the building type. Peter replies with the right next step: a design-stage review, a site survey, a diagnostic call-out or a scoped quotation. Response within one working day.

Talk to the Engineer Directly

Peter Teh (Teh Hon Kee)

Lead KNX Integrator

Phone / WhatsApp

+6016-531 3713

Based in

Kuala Lumpur · serving all Malaysia

Hours

Mon-Fri 9:00-18:00 · Sat 10:00-15:00

24/7 emergency cover on Gold contracts

Send Your Enquiry

By submitting you agree to be contacted about your enquiry. Your details are not shared with third parties.

Free Consultation

No-obligation site visit & quote within the Klang Valley.

Quick Response

We typically respond within 2-4 hours in business hours.

Detailed Quote

Itemised quotation with device specs within 3-5 days.

Engineer and client reviewing an open distribution board and drawings during a site survey

A design review costs you nothing and usually saves a redesign.

Bring drawings, a photo of the panel, or just the building type.