The Project Record, by Sector and by Type

Every project type we have delivered since 2014, with the count behind it, and case notes written the way a peer would want to read them.

67 Project Types. Not 67 Variations of a Smart Home.

Breadth is what separates a KNX integrator from a smart-home dealer. Residential, commercial, industrial and higher-education work each has its own list below. A lecture-theatre exam scene, a warehouse aisle release, a hotel vacant set-back, a guardhouse boom barrier, a maximum-demand shedding sequence, a museum lux limit and a prayer-time lighting schedule are all the same bus and completely different engineering. Here is what has actually been delivered, by type. 50 types sit in the four sectors, plus 17 cross-sector types for community buildings, estate infrastructure and system rescue.

Condominium Show Unit & Sales Gallery

Demonstration scenes, guided sequences and a reset routine that survives a thousand walk-throughs.

17DELIVERED

Serviced Apartment Bulk Fit-Out

Repeated type-unit template rolled out per unit with serialised device schedules.

11DELIVERED

Condo Common Area & Clubhouse

Lobby, corridor, gym, pool deck and function room on scheduled and occupancy-driven scenes.

9DELIVERED

Link & Terrace House

Whole-home lighting, air-conditioning scheduling, gate and alarm integration.

44DELIVERED

Semi-D & Bungalow

Multi-zone lighting, shading, climate and security across three or more levels.

28DELIVERED

Penthouse & Duplex

Cinema, multi-room audio, full shading and climate integration on a single bus.

7DELIVERED

Gated Township Landed Rollout

Identical package deployed across a phase, with a common documentation standard.

5DELIVERED

Multi-Generation & Accessible Home

Large tactile plates, night paths, fall-safe lighting and simple carer overrides.

6DELIVERED

Off-Grid Villa with Solar & Battery

Load priority and shedding logic tied to state of charge and generation.

3DELIVERED

Corporate HQ Office Floor (Landlord CAT-A)

Base-build lighting zoning, daylight harvesting and metering ready for tenant split.

11DELIVERED

Tenant Fit-Out (CAT-B)

Tenant scenes and control tied back into the landlord base-build system.

15DELIVERED

Bank Branch & Front Office

Trading-hours scenes, secure-area logic and after-hours lockdown.

5DELIVERED

Co-Working & Flexible Workspace

Bookable-room logic, occupancy release and per-zone energy allocation.

8DELIVERED

SOHO & Small Office Suite

Work and after-hours modes, presence-driven lighting, remote access.

10DELIVERED

Boardroom & Meeting-Room Logic

Presentation, video-call and cleaning scenes with AV and blind integration.

14DELIVERED

Design Studio & Boutique Office

Tunable white for colour-critical work, presence control, energy dashboard.

3DELIVERED

Hotel Guest-Room Management (GRMS)

Welcome, sleep and vacant modes with energy set-back on unoccupied rooms.

6DELIVERED

Hotel Lobby, Ballroom & F&B Outlets

Layered lobby scenes, ballroom presets for banquet, conference and cleaning.

3DELIVERED

Resort Villa Cluster

Standalone villa control reporting into a central operations view.

3DELIVERED

Serviced Residence Guest Control

Simple guest interface over a managed back-end with housekeeping status.

4DELIVERED

Restaurant & Bar Ambience

Day, dinner and late scenes with signage and exhaust scheduling.

10DELIVERED

Heritage Shophouse Café

Heritage-sensitive routing and surface finishes, full ambience control.

8DELIVERED

Mall Common Area & Atrium

Trading-hours scenes, feature-lighting sequences and back-of-house control.

5DELIVERED

Retail Lot & Boutique

Open, trade, closing and stocktake scenes with façade signage timing.

12DELIVERED

Car & Luxury Showroom

Vehicle spotlight scenes, tunable white and after-hours display mode.

5DELIVERED

Supermarket & Grocery

Aisle lighting zones with refrigeration and cold-aisle monitoring.

3DELIVERED

Clinic & Specialist Suite

Consult, procedure and waiting-room scenes with after-hours security.

7DELIVERED

Private Hospital Wards & Corridors

Day, night and nurse-round lighting in wards, with corridor set-back after lights-out.

3DELIVERED

Production Hall High-Bay Zoning

Aisle-by-aisle zoning with occupancy release on idle lines.

14DELIVERED

Warehouse & Logistics Distribution Centre

Racking-aisle presence control and roof-light-linked dimming with maintained lux.

13DELIVERED

Cold Room & Process Monitoring

Temperature logging, door-open alerts and out-of-band escalation.

6DELIVERED

Cleanroom & E&E Fab Support Areas

Gowning, corridor and sub-fab plant areas controlled outside the classified envelope.

7DELIVERED

Maximum-Demand & Load Shedding

Staggered plant start-up and priority shedding to flatten the monthly peak.

12DELIVERED

Genset, ATS & Incomer Monitoring

Status, run-hours and changeover events surfaced to the operations view.

7DELIVERED

Solar PV & Battery-Aware Control

Loads scheduled against generation and state of charge.

8DELIVERED

EV Charging Load Management

Charger allocation capped against the building incomer.

6DELIVERED

Data Centre White Space & Ancillary Areas

Aisle lighting on approach, plant-room control and environmental alarms into the NOC.

5DELIVERED

Factory Office, Canteen & Amenity Block

Shift-linked schedules for offices, canteens, prayer rooms and change rooms.

10DELIVERED

Compressed Air, Pump & Plant-Room Scheduling

Plant run to production calendar, with run-hours and fault alarms per machine.

7DELIVERED

Lecture Theatre & Auditorium

Presentation, lecture-capture, exam and cleaning scenes driven from one lectern plate.

14DELIVERED

Teaching & Research Laboratory

Bench and fume-cupboard zones, after-hours lock-out and out-of-hours alarm routing.

11DELIVERED

Library & Learning Commons

Occupancy-led stack lighting, 24-hour study zones and closing-sequence scenes.

7DELIVERED

Residential College & Student Hostel

Per-room AC and lighting limits, vacant set-back and semester-break shutdown.

13DELIVERED

Examination & Multipurpose Hall

Exam, convocation-rehearsal and event presets with run-time limits on cooling.

6DELIVERED

Faculty & Administration Block

Office-floor zoning, meeting-room logic and metering per faculty cost centre.

10DELIVERED

Classroom & Tutorial Room Retrofit

Wireless KNX retrofit room by room during semester breaks, no wall hacking.

8DELIVERED

Campus-Wide Energy Metering & Reporting

Sub-metering per building and faculty, rolled up for the estates office and GBI reporting.

6DELIVERED

Campus Streetlighting & Covered Walkways

Astronomical-clock switching, curfew dimming and safe-route lighting after dark.

7DELIVERED

University Sports Complex & Courts

Per-court switching, booking-linked timers and tournament lighting presets.

5DELIVERED

Convocation & Great Hall

Ceremony, rehearsal and house-light sequences coordinated with AV.

3DELIVERED

School & Kindergarten

Simple teacher controls, bell-linked schedules, holiday shutdown.

3DELIVERED

Surau & Mosque

Prayer-time lighting and air-conditioning driven by local azan timings.

5DELIVERED

Temple & Church Hall

Service, festival and caretaker scenes on a single wall plate.

3DELIVERED

Community & JMB Hall

Bookable-hall lighting, air-conditioning run-time limits and usage logging.

3DELIVERED

Museum & Gallery Lighting

Lux and exposure limits on sensitive works, curated scene changes.

2DELIVERED

Guardhouse, Barrier & Perimeter

Boom barriers, perimeter beams, panic alerts and CCTV event triggers.

5DELIVERED

Landscape & FaçAde Lighting

Astronomical-clock scenes, festival modes and storm-safe operation.

7DELIVERED

Car Park Lighting & Ventilation

Occupancy-linked dimming with CO-driven fan staging.

5DELIVERED

Swimming Pool & Water Features

Pump, dosing and feature-lighting schedules with fault alerting.

3DELIVERED

Irrigation & Roof Garden

Zoned watering with rain skip and leak detection on the water meter.

3DELIVERED

Lift Lobby & Access Scheduling

Floor-access rules by time and tenant, with full event logging.

3DELIVERED

Orphaned System Recovery

Bus read back, ETS project and group addresses rebuilt, system re-documented.

16DELIVERED

Legacy BMS to KNX Migration

Proprietary controls replaced or bridged, ending single-vendor lock-in.

4DELIVERED

DALI & DALI-2 Lighting Upgrade

Addressable luminaires brought under KNX with per-fitting fault reporting.

4DELIVERED

Phased Device Replacement

End-of-life hardware swapped block by block against an agreed budget.

3DELIVERED

Post-Handover Defect Rectification

Developer-side snagging closed out with a traceable record per unit.

3DELIVERED

Pre-Purchase System Audit

Condition, documentation and residual-life report before an asset changes hands.

2DELIVERED

Not on the list? It has most likely been done once or twice and has not yet earned a row of its own. Describe the building and the constraint, and we will tell you honestly whether KNX is the right answer, or whether something simpler would serve you better.

30 Entries from the Project Record, Across All Four Sectors

Client names stay confidential unless they have told us otherwise, so these are described the way a peer would want to read them: what the constraint was, what was engineered, and what was handed over.

Residential tower, Klang Valley, Developer bulk rollout, 2 blocks - KNX Malaysia project record

Residential

Residential Tower, Klang Valley

Developer bulk rollout, 2 blocks

One type-unit engineered and signed off, then replicated per unit with its own ETS sub-project and serialised device schedule. Released floor by floor to follow the vacant-possession programme.

Units delivered
Bulk, phased
Common areas
Lobby, corridor, gym, deck
Handover
Per-unit test sheet + JMB pack
TYPE-UNIT TEMPLATEPHASED VPJMB PACK
Sales gallery and show unit, Developer launch package - KNX Malaysia project record

Residential

Sales Gallery and Show Unit

Developer launch package

A guided demonstration sequence a sales consultant can run in ninety seconds, plus a reset routine that returns the unit to its opening state after every viewing. Programmed so a thousand walk-throughs cannot leave it in a broken scene.

Demo
One-touch guided sequence
Reset
Automatic between viewings
Handover
Same platform as the sold units
DEMO SEQUENCERESET ROUTINELAUNCH READY
Serviced apartment bulk fit-out, Type-unit template, replicated per unit - KNX Malaysia project record

Residential

Serviced Apartment Bulk Fit-Out

Type-unit template, replicated per unit

One unit is engineered, programmed, tested and signed off as the template. Every subsequent unit is a replication with its own ETS sub-project, serialised device schedule and test sheet, so programming cost per unit falls sharply after the first.

Engineered once
Signed-off type unit
Per unit
Own ETS sub-project
Cost curve
Falls after unit one
ONE TEMPLATESERIALISEDPER-UNIT FILE
Corporate office floors, KL, Landlord base-build plus tenant fit-out - KNX Malaysia project record

Commercial

Corporate Office Floors, KL

Landlord base-build plus tenant fit-out

Base-build lighting zoned and metered so tenant consumption splits cleanly, then tenant scenes layered on top without touching the landlord logic. After-hours waste was the first thing the data exposed.

Control
Presence + constant lux
Metering
Per floor and per tenant
Reporting
Monthly, exportable
DALI-2DAYLIGHT HARVESTINGSUB-METERING
Boutique hotel, heritage district, Guest-room management, phased - KNX Malaysia project record

Commercial

Boutique Hotel, Heritage District

Guest-room management, phased

Welcome, sleep and vacant modes per room with energy set-back on unoccupied stock. Rolled out one floor at a time so the hotel never stopped trading.

Rooms
Floor-by-floor release
Set-back
Automatic on vacancy
Front desk
Room status at a glance
GRMSVACANT SET-BACKTRADING THROUGHOUT
Manufacturing plant, southern corridor, High-bay zoning and demand control - KNX Malaysia project record

Industrial

Manufacturing Plant, Southern Corridor

High-bay zoning and demand control

Aisle-by-aisle high-bay zoning with occupancy release on idle lines, plus staggered plant start-up and priority shedding to flatten the monthly maximum-demand charge.

Lighting
Zoned per production aisle
Demand
Staggered start + shedding
Data
Modbus meters into KNX
HIGH-BAYLOAD SHEDDINGMAXIMUM DEMAND
Gated township, Selangor, Estate infrastructure and landed phase - KNX Malaysia project record

Residential

Gated Township, Selangor

Estate infrastructure and landed phase

Guardhouse, boom barriers, perimeter beams and panic alerting tied into the same bus as landscape and streetscape lighting, with an identical home package repeated across the landed phase.

Perimeter
Barriers, beams, panic
Streetscape
Astro-clock scenes
Homes
One repeatable package
GUARDHOUSESTREETSCAPELANDED PHASE
Multi-generation home, Subang Jaya, Three generations, one set of plates - KNX Malaysia project record

Residential

Multi-Generation Home, Subang Jaya

Three generations, one set of plates

Floor-level night paths that light on the first step out of bed, large tactile plates the grandparents can read without glasses, and a carer override that brings every light in the house up from one button.

Night paths
Presence-lit, floor level
Plates
Large-button, engraved
Override
One button, whole house
NIGHT PATHSLARGE TACTILE PLATESCARER OVERRIDE
Duplex penthouse, Mont Kiara, Cinema, audio, shading and climate on one bus - KNX Malaysia project record

Residential

Duplex Penthouse, Mont Kiara

Cinema, audio, shading and climate on one bus

Motorised shading, multi-room audio and a cinema scene coordinated with the interior designer, with the plate schedule fixed before the joinery was drawn so every plate sits in the veneer exactly where it was detailed.

Levels
Two, plus roof terrace
Scenes
14 across both levels
Plates
Finish-matched to joinery
CINEMA SCENEMULTI-ROOM AUDIOSHADING
Mall concourse and atrium, Common-area scenes and feature lighting - KNX Malaysia project record

Commercial

Mall Concourse and Atrium

Common-area scenes and feature lighting

Trading-hours scenes across the concourse with a tunable-white gradient through the feature cove, plus back-of-house and service-corridor control on the same system.

Scenes
Open, trade, close, clean
Feature cove
Tunable white sequence
Override
Centre-management panel
ATRIUMTUNABLE WHITETRADING HOURS
University teaching block, Lecture theatres and laboratories - KNX Malaysia project record

Higher Education

University Teaching Block

Lecture theatres and laboratories

Presentation, exam and cleaning scenes with sequenced blackout blinds, driven from one plate at the lectern so teaching staff never need a manual.

Rooms
Theatres, labs, seminar
Control
One plate per room
Blinds
Sequenced with scene
PRESENTATION SCENESBLACKOUT BLINDSEXAM MODE
Heritage shophouse conversion, Boutique café, conservation constraints - KNX Malaysia project record

Commercial

Heritage Shophouse Conversion

Boutique café, conservation constraints

Full ambience control delivered without cutting into original fabric: surface routing agreed with the conservation consultant, plates recessed only where the wall build-up already allowed it.

Fabric
No original material cut
Scenes
Day, dinner, late, close
Plates
Finish-matched to interior
CONSERVATIONSURFACE ROUTINGAMBIENCE
Orphaned system recovery, Managed office tower, no documentation - KNX Malaysia project record

Commercial

Orphaned System Recovery

Managed office tower, no documentation

Original integrator uncontactable, no ETS file, no passwords, nobody willing to touch the panel. We read the live bus, rebuilt the project and group addresses, re-labelled the panel and took over maintenance.

Found
No file, no labels
Rebuilt
Full ETS + group addresses
Now
Under contract, backed up
ETS RECOVERYRE-DOCUMENTEDTAKEN OVER
Control panel build standard, How every panel leaves our bench - KNX Malaysia project record

Every Sector

Control Panel Build Standard

How every panel leaves our bench

Device labelling, combed twisted-pair runs, segregation from mains, spare capacity stated and the wiring diagram in the door pouch. This is the difference between a system you can service in ten minutes and one nobody dares open.

Labelling
Every device, both ends
Spare ways
Stated at handover
Diagram
Inside the panel door
LABELLEDCOMBEDDOCUMENTED
Commissioning and witnessed testing, What actually gets signed off - KNX Malaysia project record

Every Sector

Commissioning and Witnessed Testing

What actually gets signed off

Bus voltage and loading verified, telegram traffic monitored under load, every circuit and every zone tested against a written sheet, then a functional test witnessed by the consultant or owner before handover.

Verified
Voltage, loading, traffic
Recorded
Per circuit, per zone
Signed
By the witness, at handover
BUS MONITORTEST SHEETSWITNESSED
Basement car park, mixed-use development, Occupancy-linked lighting and CO ventilation - KNX Malaysia project record

Commercial

Basement Car Park, Mixed-Use Development

Occupancy-linked lighting and CO ventilation

Aisles dim to a safe standby level and lift to full on detection, while extract fans stage against CO rather than running flat out. One of the fastest paybacks in any building because the load runs all day.

Lighting
Standby plus occupancy lift
Ventilation
CO-staged fans
Reporting
Run hours per fan
OCCUPANCY DIMMINGCO STAGINGRUN HOURS
Facade and crown lighting, mixed-use tower, Architectural scene control - KNX Malaysia project record

Commercial

Facade and Crown Lighting, Mixed-Use Tower

Architectural scene control

Astronomical-clock switching with curfew dimming, festival colour scenes for Raya, Chinese New Year and Deepavali, and an automatic safe state when the weather station reports high wind or heavy rain.

Switching
Sunset to curfew, by date
Scenes
Festival and national days
Safety
Weather-triggered safe state
ASTRO CLOCKFESTIVAL SCENESSTORM SAFE
Surau, corporate campus, Prayer-time lighting and cooling - KNX Malaysia project record

Commercial

Surau, Corporate Campus

Prayer-time lighting and cooling

Lighting and air-conditioning follow the daily prayer schedule instead of running all day, with a manual override for Friday and Ramadan. A small scope that quietly removes a large share of an idle building load.

Schedule
Follows local azan timings
Override
Manual, at the wall
Set-back
Automatic between prayers
AZAN TIMINGSZONED COOLINGLOW ENERGY
EV charging bays, commercial car park, Charger load capped to the incomer - KNX Malaysia project record

Industrial

EV Charging Bays, Commercial Car Park

Charger load capped to the incomer

Charger output is allocated dynamically against measured building load, so bays can be added without upgrading the incoming supply and without pushing the monthly maximum-demand charge.

Allocation
Dynamic, against live load
Supply
No incomer upgrade
Priority
Building loads first
LOAD ALLOCATIONMAX DEMANDNO UPGRADE
Wall interface finish study, Plate selection for an interior package - KNX Malaysia project record

Every Sector

Wall Interface Finish Study

Plate selection for an interior package

Five plate families sampled against the material palette before a single back box was set out, so the plate schedule went into the tender drawings rather than being decided on site.

Sampled
Glass, alu, black, timber
Fixed early
Back-box depth agreed
Output
Plate schedule + symbols
GLASSALUMINIUMENGRAVED
Regional distribution centre, Shah Alam, Racking aisles, loading dock and yard - KNX Malaysia project record

Industrial

Regional Distribution Centre, Shah Alam

Racking aisles, loading dock and yard

Every racking aisle lights on forklift approach and releases after it leaves, with roof-light dimming along the picking faces. Dock lighting follows the booked bay schedule instead of burning all night.

Aisles
Presence-released, per aisle
Dock
Lit only for booked bays
Duty
24/7, three shifts
AISLE PRESENCEDOCK SCHEDULING24/7 DUTY
E&E fab support areas, Kulim, Gowning, corridors and sub-fab plant - KNX Malaysia project record

Industrial

E&E Fab Support Areas, Kulim

Gowning, corridors and sub-fab plant

Everything around the classified envelope: gowning rooms, grey corridors and sub-fab plant, controlled and alarmed without touching the validated cleanroom systems. Every change goes through the client change-control form.

Scope
Support areas only
Alarms
Into the fab control room
Changes
Client change-control
OUTSIDE THE ENVELOPEALARM ROUTINGCHANGE CONTROL
Automotive parts plant, Senai, Maximum-demand control and staggered start - KNX Malaysia project record

Industrial

Automotive Parts Plant, Senai

Maximum-demand control and staggered start

Compressors, chillers and oven banks brought up in a timed sequence after every shift change, with non-critical loads shed in priority order as the half-hour demand window approaches its target.

Metering
Modbus meters on each incomer
Shedding
Five priority stages
Result
Peak held under target
MAX DEMANDLOAD PRIORITYMODBUS METERING
Food processing plant, Selangor, Cold-room monitoring and escalation - KNX Malaysia project record

Industrial

Food Processing Plant, Selangor

Cold-room monitoring and escalation

Temperature logged per cold room for the audit trail, door-open alarms after a set time, and escalation by SMS to the on-call supervisor if nobody acknowledges within ten minutes.

Rooms
Logged every minute
Doors
Timed open alarm
Escalation
On-call, then manager
TEMPERATURE LOGDOOR ALERTSESCALATION
Colocation data hall, Cyberjaya, White space lighting and plant alarms - KNX Malaysia project record

Industrial

Colocation Data Hall, Cyberjaya

White space lighting and plant alarms

Cold-aisle lighting that follows the engineer rather than burning around the clock, plant-room and leak alarms passed to the NOC, and a bus topology with no single point of failure in the control path.

Lighting
On approach, per aisle
Alarms
Leak, door, plant to NOC
Topology
Segmented, redundant supply
APPROACH LIGHTINGNOC ALARMSNO SINGLE POINT
Residential colleges, public university, Hostel energy control, 1,200 rooms - KNX Malaysia project record

Higher Education

Residential Colleges, Public University

Hostel energy control, 1,200 rooms

Air-conditioning in every room limited to agreed hours and set back when the keycard leaves, with a single command that shuts whole blocks down for the semester break. Rolled out one block per break.

Rooms
1,200, block by block
AC
Run-time limits + set-back
Breaks
One-command shutdown
AC RUN-TIME LIMITSSEMESTER SHUTDOWNPER-BLOCK METERING
University library and learning commons, 24-hour study zone and stack lighting - KNX Malaysia project record

Higher Education

University Library and Learning Commons

24-hour study zone and stack lighting

Stacks light on occupancy and fall back to a maintained minimum, the 24-hour study zone runs independently, and a staged closing sequence clears each floor before the building is secured.

Stacks
Occupancy-led
Study zone
Independent, 24 hours
Closing
Staged, floor by floor
OCCUPANCY LED24-HOUR ZONECLOSING SEQUENCE
Examination and multipurpose hall, Exam, event and convocation presets - KNX Malaysia project record

Higher Education

Examination and Multipurpose Hall

Exam, event and convocation presets

Exam mode locks lighting at full uniform level and blinds down so nothing changes mid-paper. Event and rehearsal presets sit on the same plate, and cooling run-time is capped when the hall is booked but empty.

Exam
Locked uniform scene
Events
Rehearsal and ceremony
Cooling
Booking-linked, capped
EXAM MODEEVENT PRESETSCOOLING LIMITS
Tutorial room retrofit, private university, 142 rooms over two semester breaks - KNX Malaysia project record

Higher Education

Tutorial Room Retrofit, Private University

142 rooms over two semester breaks

A wireless KNX plate beside each door, presence control in the ceiling and one room template cloned 142 times. Delivered only inside the semester breaks, so no teaching hour was lost.

Rooms
142, one template
Method
KNX RF, surface fixed
Teaching lost
None
KNX RFNO WALL HACKINGBREAK-WINDOW DELIVERY
Campus-wide energy reporting, Metering per faculty for the estates office - KNX Malaysia project record

Higher Education

Campus-Wide Energy Reporting

Metering per faculty for the estates office

Every faculty building sub-metered and rolled up into one monthly report for the estates office, so energy is charged back to the faculty that used it and the green-building evidence is already assembled.

Buildings
All faculty blocks
Reporting
Monthly, per cost centre
Evidence
Ready for GBI audit
SUB-METERINGPER FACULTYGBI EVIDENCE

Book a Design Review

Send the drawings, the problem, or just the building type. Peter replies with the right next step: a design-stage review, a site survey, a diagnostic call-out or a scoped quotation. Response within one working day.

Talk to the Engineer Directly

Peter Teh (Teh Hon Kee)

Lead KNX Integrator

Phone / WhatsApp

+6016-531 3713

Based in

Kuala Lumpur · serving all Malaysia

Hours

Mon-Fri 9:00-18:00 · Sat 10:00-15:00

24/7 emergency cover on Gold contracts

Send Your Enquiry

By submitting you agree to be contacted about your enquiry. Your details are not shared with third parties.

Free Consultation

No-obligation site visit & quote within the Klang Valley.

Quick Response

We typically respond within 2-4 hours in business hours.

Detailed Quote

Itemised quotation with device specs within 3-5 days.

Engineer and client reviewing an open distribution board and drawings during a site survey

A design review costs you nothing and usually saves a redesign.

Bring drawings, a photo of the panel, or just the building type.