Services, Packages and Maintenance

Four ways a project starts, fixed-scope packages for every sector, and maintenance with a response time you can hold us to.

Four Ways a Project Starts with Us

Some clients arrive with a drawing set, some with a panel nobody dares open. Figures below are indicative starting points. Every building is surveyed and quoted in writing before anything is committed.

Maintenance contracts for KNX systems in Malaysia
CONTRACT

Maintenance Contracts

Scheduled preventive servicing, bus health checks, ETS backups and a response time you can hold us to.

  • One to four visits a year
  • Guaranteed response time
  • ETS project and config backups

From

RM 2,880 /year

Request a Plan
Repair and fault-finding for KNX systems in Malaysia
MOST URGENT

Repair and Fault-Finding

Bus-level diagnostics, telegram tracing and device testing to find the actual root cause, not the obvious symptom.

  • On-site and remote diagnostics
  • Bus monitor and telegram analysis
  • Emergency call-outs

Diagnostic from

RM 380 /visit

Book a Call-Out
New implementation for KNX systems in Malaysia
PROJECT

New Implementation

Design-build from first principles: topology, loading, panel design, ETS programming, commissioning and documentation.

  • Design, BQ and schematics
  • ETS programming and commissioning
  • As-built docs and training

Project from

RM 14,800

Book a Design Review
Retrofit and system rescue for KNX systems in Malaysia
UPGRADE

Retrofit and System Rescue

Take over an orphaned system, recover the ETS project, and add intelligence to an occupied building without wall hacking.

  • ETS recovery and re-documentation
  • Legacy or BMS migration to KNX
  • Phased device replacement

Audit from

RM 1,800

Request an Audit

One Accountable Engineer, One Trained Crew

Consultation and Design

Site survey, load and device schedules, riser and distribution board design, schematics and a scope engineered to land on your target budget.

ETS Programming

Device addressing, group-address structuring, logic functions, scene creation and visualisation using official KNX ETS software. Documented and backed up.

Installation and Retrofit

Professional cabling, DB build-out, device mounting and commissioning - wired TP or wireless KNX RF for occupied buildings with no wall-hacking.

After-Sales Support

WhatsApp support in business hours (24/7 on Gold contracts), remote diagnostics and rapid system modifications. You always reach the engineer who knows your system.

Maintenance Packages

Scheduled preventive servicing, bus health checks, ETS project backups and priority SLA response - so small issues never become downtime.

Operator and User Training

Hands-on training and plain-language documentation so the building team, or the household, runs the system day to day without calling anyone.

Repair and System Rescue

Recover orphaned systems with no docs or passwords: re-read the bus, rebuild the ETS project, fix faults and bring the system back under control.

// QUICK SCOPE ESTIMATOR

An Indicative Budget in Under a Minute

Indicative only - we confirm on site. Want it component by component instead? Use the full budget calculator.

Small · 10Large · 600+

ESTIMATED RANGE

{{ estimateRange }}

{{ estimateUnit }}

Service{{ svcLabel }}
Property{{ buildingLabel }}
Scale~{{ est.devices }} devices

No obligation. We reply within business hours.

Fixed-Scope Packages in Every Sector

Published prices for the six scopes we are asked for most often, across homes, office floors, warehouses and lecture theatres. Each one is the full engineering standard at a smaller scale, and each one extends later without replacing what is already on the bus.

Residential

Condo Essential

Single 3-bedroom condominium or apartment unit

RM 15,888

indicative · incl. installation & programming

  • Lighting control + dimming
  • AC / FCU control
  • Mobile app control
  • 4 smart glass switches
  • ETS programming & handover
Enquire
MOST POPULAR

Residential

Terrace / Link House

Double-storey link & terrace homes

RM 24,888

indicative · incl. installation & programming

  • Whole-home lighting scenes
  • AC scheduling
  • Auto-gate & alarm integration
  • Motion sensors
  • Voice control ready
Enquire

Residential

Wireless Retrofit

Existing/occupied homes - no wall hacking

RM 18,888

indicative · incl. installation & programming

  • KNX RF wireless
  • Lighting + shading
  • No renovation needed
  • App + scenes
  • Expandable later
Enquire

Commercial

Office Floor Essentials

One office floor up to 10,000 sq ft, CAT-A or CAT-B

RM 36,800

indicative · incl. installation & programming

  • Presence and constant-lux zoning
  • Four meeting-room scenes with blinds
  • After-hours schedule and override
  • Floor-level energy sub-meter
  • ETS file and as-built handover
Enquire

Industrial

Warehouse Aisle Zoning

Racking aisles, minimum eight, rate falls with aisle count

From RM 3,600 / aisle

indicative · incl. installation & programming

  • Presence detection at both aisle ends
  • Safe standby level, never dark
  • Daylight-linked maintained lux
  • Lighting board sub-metering
  • Worked aisle by aisle, site stays live
Enquire

Higher Education

Lecture Theatre Package

One lecture theatre or auditorium, up to 300 seats

RM 29,800

indicative · incl. installation & programming

  • Lectern and door plates, four scenes
  • Blackout blinds sequenced with scene
  • Idle shutdown of lights, AC and projector
  • Lecturer quick card at the lectern
  • Installed inside the semester break
Enquire

Hotels, factories, whole campuses, larger buildings and portfolios are scoped and quoted individually - request a site assessment.

Condominium living room in the evening with an automated lighting scene and a flush glass control plate

The entry package, running an evening scene.

Every pack is the full standard at a smaller scope.

Engineer fitting a flush control plate into an existing back box on a finished marble wall without hacking

The retrofit pack, going into a finished wall.

Wireless KNX RF where hacking the wall is not an option.

Keep It Running: Pick a Service Level

Cover that scales with the building. Every tier includes the ETS project backup and a written report you can put in front of ownership. Indicative pricing, confirmed after a site survey.

Essential

Bronze

Small buildings & homes

RM 2,880 /year

  • Response SLANext business day
  • Preventive visits1 / year
  • Remote monitoring -
  • ETS & config backupsYes, offsite
  • Emergency call-outChargeable
  • Health reportAnnual
Request This Plan
RECOMMENDED

Professional

Silver

Mid-size & multi-tenant

RM 7,800 /year

  • Response SLAWithin 8 hours
  • Preventive visits2 / year
  • Remote monitoringBusiness hours
  • ETS & config backupsYes, offsite
  • Emergency call-outPriority
  • Health reportQuarterly
Request This Plan

Enterprise

Gold

Towers, hotels, portfolios

From RM 14,800 /year

  • Response SLAUnder 4 hours
  • Preventive visits4 / year
  • Remote monitoring24/7 + alerts
  • ETS & config backupsYes, offsite
  • Emergency call-out24/7 included
  • Health reportMonthly + KPIs
Request This Plan
Service van at the loading bay of a Kuala Lumpur office tower during an after-hours KNX call-out

Contract clients get a defined response time, not a queue position.

Gold tier covers 24/7 attendance. Every tier includes the offsite ETS backup.

What lands on your desk

The Paperwork Is the Product

Hardware is a commodity: the same devices are available to everyone. What you are actually buying is the design that sizes them, the discipline that installs them and the documentation that lets someone else maintain them in year seven.

Design stage deliverables for a KNX building automation project

Design Stage

  • Vendor-neutral specification clause set
  • Bus topology & single-line diagrams
  • Bus-loading & power-supply sizing calculations
  • Riser, containment & cable schedule
  • Switch-plate schedule with finishes
  • Sensor positions for the reflected ceiling plan
  • Indicative points list & bill of quantities
Build stage deliverables for a KNX building automation project

Build Stage

  • Panel layouts & device schedules
  • Labelled DIN-rail build with combed cabling
  • Group-address structure & naming standard
  • Per-circuit installation test sheets
  • Site progress record with panel photography
  • Coordination notes for the electrical contractor
Handover deliverables for a KNX building automation project

Handover

  • Full as-built drawing set
  • ETS project file & offsite backup
  • Device inventory with warranty dates
  • Witnessed functional test certificate
  • Operating guide & quick-reference card
  • Operator and facility-team training session

Written Against the Standards You Have to Answer To

You are the one whose name goes on the submission. Everything we issue is framed so it can be attached to it without rewriting.

Request the Spec Clause Set

Vendor-neutral and free. Written so three integrators can price it like for like.

ISO/IEC 14543-3

The KNX open standard itself. Guarantees any certified integrator can take the system over.

EN 50090

European home and building electronic systems series that KNX device certification is built on.

MS 1525

Malaysian energy-efficiency standard for non-residential buildings. Zoning, daylight and occupancy control and metering all map directly to KNX functions.

MS IEC 60364 / UBBL

Electrical installation and by-law requirements the containment, segregation and panel build are executed to.

GBI / GreenRE / LEED

Green-building rating tools where KNX control and metered data support energy-management credits.

EECA 2024 (Energy Commission)

Sub-metered consumption data in the form a registered energy manager reports on under the Energy Efficiency and Conservation Act 2024.

Standards and programme references are given for general guidance. Applicability to a specific project should be confirmed with the relevant Malaysian authority or your appointed professional.

Right-Sized Engineering, Not Value-Engineered to Death

KNX earned its reputation on airports and five-star hotels, and a lot of integrators still price like it. We built the practice around the opposite problem: hitting a Malaysian budget without quietly deleting the parts that make the system last twenty years.

Where the Cost Actually Comes Out

  • Right-sized device count. Function per room is agreed before the bill of quantities, so nobody pays for channels that were never going to be used.
  • Multi-vendor sourcing. 500+ certified manufacturers interoperate. We mix them on price and lead time instead of honouring one distributor agreement.
  • Repeatable templates. On bulk residential, one type-unit is engineered once and replicated. Programming cost per unit falls sharply after the first.
  • Phased rollout. Infrastructure and containment first, intelligence later. KNX extends without rework if the topology was designed for it.
  • Energy pays part of the bill. A verified 20% to 35% reduction is real money against an operating budget, not a brochure number.

Where It Never Comes Out

  • Topology margin. Lines are loaded with spare capacity and segmented properly. Cramming devices onto one line to save a coupler is how buildings get intermittent faults nobody can find.
  • Power-supply headroom. Sized with stated margin, never at the limit, and never shared across a segment it was not calculated for.
  • Labelling and containment. Both ends of every cable, every device, segregated from mains. This is what makes a fault a ten-minute job.
  • Documentation and backups. As-built set, group-address list, ETS project held and backed up offsite. A cheap system with no file is worth nothing the day it misbehaves.
  • Witnessed testing. Per circuit, per zone, signed. If it was not tested in front of someone, it was not commissioned.

“I have opened a lot of panels that were cheap on day one. Every one of them cost the owner more by year three. Cut the scope if you must, never the engineering.”

Peter Teh, lead KNX integrator
Peter Teh
TEH HON KEE · LEAD INTEGRATOR

TYPICAL ENGAGEMENT BANDS

From RM15,000

Single unit, entry scope, full standard

RM30,000 to RM100,000

Landed homes, office floors, lecture theatres, warehouse zones

Above RM100,000

Towers, estates, bulk rollouts, phased plant

Indicative only. Every scope is surveyed and quoted in writing before anything is ordered.

388 of Our Projects Sit Under RM100,000

How a Project Runs, Stage by Stage

On a bulk rollout the same sequence repeats per block, so commissioning tracks your programme instead of piling up at the end.

Cabling and containment, KNX Malaysia project work
STAGE 01
Cabling and containment

Bus cable, containment and distribution boards installed to schedule, segregated from mains and labelled at both ends.

ETS engineering, KNX Malaysia project work
STAGE 02
ETS engineering

Device addressing, group-address structure, logic, scenes and visualisation, all held in a project file that stays yours.

Commissioning and handover, KNX Malaysia project work
STAGE 03
Commissioning and handover

Witnessed functional testing, on-site scene tuning, documentation issued and the building team trained on it.

Where the Package Sits in a Developer Programme

The expensive mistake is treating automation as a fit-out item. Containment, back boxes and riser space are structural decisions. Get them into the electrical package and the intelligence can be added at any point afterwards for a fraction of the cost.

Book a Design Review
01

Concept & Schematic Design

Control philosophy per space, indicative device count, budget band and a cost-per-unit figure the feasibility can carry.

02

Detailed Design & Tender

Vendor-neutral specification, topology and loading, riser and containment requirements, plate schedule, points list and bill of quantities.

03

Electrical Package on Site

Containment, back boxes, bus cable pulled and tested by the electrical contractor against our schedule. No automation devices yet.

04

Type-Unit Engineering

One unit built, programmed, tested and signed off as the template that every subsequent unit is replicated from.

05

Block-By-Block Rollout

Devices installed and programmed per unit against the vacant-possession sequence, each with its own test sheet.

06

Handover and Defect Liability Period

As-built set, ETS backup, device inventory and training for the building team, then a traceable defect record for the whole liability period.

And the Same Discipline on a Single Building

01

Assess

Site survey, DBs & bus topology

02

Document

Read bus with ETS, rebuild docs

03

Design / Quote

Clear scope + fixed quotation

04

Install

Cabling, mounting, ETS - phased

05

Commission

Testing, tuning & handover

06

Maintain

SLA support & backups

Questions We Are Asked About This

Do you offer maintenance contracts with an SLA for buildings?

Yes - scheduled servicing, bus health checks, ETS backups, firmware reviews and guaranteed response times by tier (next business day on Bronze, within 8 hours on Silver, under 4 hours with 24/7 emergency cover on Gold).

What if my original installer goes missing (orphaned system)?

This is a core service. We read the live bus, recover or rebuild the ETS project and group addresses, document everything and take over maintenance - you are never locked to one installer.

Can KNX integrate with our existing BMS via BACnet/Modbus?

Yes - certified BACnet/IP and Modbus TCP/RTU gateways let KNX work alongside or feed an existing supervisory BMS, so you integrate rather than rip-and-replace.

Can you write the KNX section of our tender specification?

Yes, and it costs you nothing to have it drafted. We supply a vendor-neutral clause set (scope, topology, device performance, labelling, testing and commissioning, documentation and training) plus an indicative points list and BQ structure. It is written so at least three certified integrators can price it like for like, not so it points back at us.

We already appointed a main electrical contractor. Where do you fit?

Usually as the specialist automation package under the electrical contractor or direct to the developer, depending on procurement. We provide the containment, cable and back-box requirements for them to install, then take over from termination onward: device installation, ETS programming, commissioning, testing and handover. Split of scope is agreed in writing before site works begin.

How long is the warranty and what does it cover?

We provide a 5-year workmanship warranty on programming, installation and integration. Hardware carries 1-2 year manufacturer warranties depending on brand.

All Questions

Book a Design Review

Send the drawings, the problem, or just the building type. Peter replies with the right next step: a design-stage review, a site survey, a diagnostic call-out or a scoped quotation. Response within one working day.

Talk to the Engineer Directly

Peter Teh (Teh Hon Kee)

Lead KNX Integrator

Phone / WhatsApp

+6016-531 3713

Based in

Kuala Lumpur · serving all Malaysia

Hours

Mon-Fri 9:00-18:00 · Sat 10:00-15:00

24/7 emergency cover on Gold contracts

Send Your Enquiry

By submitting you agree to be contacted about your enquiry. Your details are not shared with third parties.

Free Consultation

No-obligation site visit & quote within the Klang Valley.

Quick Response

We typically respond within 2-4 hours in business hours.

Detailed Quote

Itemised quotation with device specs within 3-5 days.

Engineer and client reviewing an open distribution board and drawings during a site survey

A design review costs you nothing and usually saves a redesign.

Bring drawings, a photo of the panel, or just the building type.