KNX Under RM100,000, Engineered Properly

Our deepest band: 388 systems, every sector, the same documentation and witnessed handover as the largest jobs.

Our deepest band

Nobody in Malaysia Has Delivered More KNX Under RM100,000

This is not a discount claim. It is a depth claim. Three hundred and eighty-eight of the systems on our record were contracted below RM100,000, across all four sectors: condominiums, terrace houses and bungalows; office floors, shoplots, clinics and hotels; warehouse zones, factory office blocks and plant-room packages; lecture theatres, laboratories and hostel blocks. We we have spent twelve years turning that band into an engineering discipline rather than a favour we do between the big jobs.

Most integrators treat a sub-RM100,000 KNX enquiry as a rounding error. We built the practice around it, and the discipline that forced on us is what the larger projects now run on. The method below does not change, whether the contract is RM16,900 or RM1.5 million.

Compact labelled KNX DIN-rail control panel built to full standard in a Malaysian terrace house on a sub-RM100,000 project

A RM24,600 house. The same panel discipline as a RM1.5 million tower.

Segregated bus, labelled both ends, power supply sized with margin, as-built clipped inside the door.

388

Projects Under RM100,000

74% of everything commissioned since 2014 was delivered inside this band.

RM38,400

Median Contract Value

Half the band lands below this figure. It is our normal day, not our exception.

RM15,888

Entry Package

The smallest complete system we will sign. Same standard as the largest.

9 days

Median Time on Site

First fix to witnessed handover for a typical home in the band.

0

Documents Dropped

No budget gets a lighter handover pack. As-built, ETS file and test sheet, always.

43%

Came Back to Extend

Owners who added zones or functions within three years, on the same bus.

Figures cover contracted project value excluding client-supplied luminaires and third-party equipment, as at October 2026.

Why This Band Is So Badly Served

A KNX project below RM100,000 needs the same design, programming and commissioning process as one ten times the size. Only the device count is smaller. That single fact explains almost everything a Malaysian homeowner, clinic owner or estates office experiences when they ask for a quotation.

What Usually Happens to the Enquiry

The enquiry is quietly declined

A RM50,000 KNX job carries the same design, programming and commissioning overhead as a RM500,000 one. Most integrators price that overhead as a fixed cost, the number looks absurd, and they stop returning the call.

The quotation is padded to make it worth doing

The scope stays small and the price does not. You are paying for an engineering process that was never streamlined for a project your size.

You are steered off KNX entirely

“KNX is overkill for your house, take these Wi-Fi switches instead.” Three years later the app is discontinued, the vendor pivoted, and the switches are landfill in a wall you already closed up.

Or you get KNX hardware with none of the KNX engineering

Certified devices, cabled and programmed by someone learning on your building. No topology calculation, no labelling, no ETS file handed over. It works on day one, and it is unfixable on day four hundred.

What We Do Instead

The overhead was engineered out, not the system

Twelve years in this band produced a kit of parts: standard panel blocks, a fixed group-address schema, tested logic modules and a device shortlist we know the lead time on. Design hours fall. Engineering does not.

The price is fixed before we order anything

A paid survey produces a scoped, written, fixed-price proposal with the points list attached. Variations only happen when you change the scope, in writing, with the cost stated first.

One crew, no learning on your building

The same trained install team, the same engineer doing the ETS work. Your RM24,000 terrace house gets the person who commissions the towers, not the person who is being trained on it.

It is designed to grow, so it does not need to be big

We size topology and containment for what the building might become, then fit what you can afford now. Adding a floor, a zone or a gate later is a device and a download, never a rewire.

Six Things That Make a Small KNX Project Work

None of them touch the engineering. Every one of them removes cost that a client should never have been asked to carry in the first place.

A Kit of Pre-Engineered Parts

Panel blocks, DIN layouts, terminal schemes and containment details already drawn and proven. We configure a known assembly instead of drawing a small project from a blank page.

One Group-Address Schema, Always

The same structured addressing standard on every project in the band. Any engineer of ours can open any of these systems and be productive in ten minutes, which is exactly why support stays cheap.

A Reusable Logic Library

Presence release, staircase timers, tropical AC set-back, rain-retract on blinds, holiday presence simulation. Written once, tested hard, reused. You are not paying for logic to be invented again.

A Short, Stocked Device List

A deliberately narrow shortlist of certified devices we hold or can get in days, chosen on price and availability across 24 manufacturers. No six-week import wait priced into your job.

One Accountable Engineer, Start to Finish

No sales handover, no coordination layer, no subcontracted programming. The person who surveys the building is the person who signs the commissioning sheet.

Fixed Scope, Fixed Price, Written

Points list, device schedule and price agreed before procurement. Small budgets die from variation orders, so we take variations off the table before the first cable is pulled.

“A small budget is not permission to engineer badly. It is a constraint, and constraints are the job. Tell me the ceiling first and I will tell you honestly what fits under it - including, sometimes, that it does not.”

Peter Teh, lead KNX integrator
Peter Teh
TEH HON KEE · LEAD INTEGRATOR

What Each Budget Actually Buys

Four rungs inside the band, with the device counts and site time we genuinely see. Written so you can find your own building before you speak to anyone. Every figure is indicative and every scope is surveyed and quoted in writing before anything is ordered.

Condominium or serviced apartment, single unit KNX installation in Malaysia at RM15,000 - RM24,000
ENTRY

RM15,000 - RM24,000

Condominium or serviced apartment, single unit

The essentials done to full standard: the lights, the air-conditioning and one set of blinds behave on their own, and the plates are the only thing you ever have to look at.

  • 8 to 12 lighting circuits, switched and dimmed
  • 2 to 3 air-conditioning zones via gateway
  • One motorised blind or curtain track
  • 4 to 6 wall plates, scene programmed
  • App access on local network plus remote
  • Full as-built pack, ETS file and test sheet

DEVICES

9 to 16

BUS LINES

1

SITE TIME

3 to 7 days

GROWTH

Sized for a second area later

Link, terrace or townhouse, whole home KNX installation in Malaysia at RM24,000 - RM45,000
MOST COMMON

RM24,000 - RM45,000

Link, terrace or townhouse, whole home

The band we deliver more of than anything else. A whole double-storey home, every level, with the gate and the alarm brought onto the same bus so one plate at the door means everything.

  • 18 to 30 lighting circuits across two or three levels
  • 4 to 5 air-conditioning zones with occupancy set-back
  • Auto-gate, main door and alarm integration
  • Motorised curtains to the living and master areas
  • Whole-home scenes: morning, away, night, holiday
  • Full as-built pack, ETS file and test sheet

DEVICES

22 to 38

BUS LINES

1 to 2

SITE TIME

2 to 3 weeks

GROWTH

Riser and spare ways for a third level

Semi-D or bungalow, shoplot or office suite, a lecture theatre, a factory office block KNX installation in Malaysia at RM45,000 - RM70,000
LARGE HOME / SMALL COMMERCIAL

RM45,000 - RM70,000

Semi-D or bungalow, shoplot or office suite, a lecture theatre, a factory office block

Where zoning starts to earn its keep. Multiple floors or multiple trading modes, energy measured rather than guessed, and a system somebody other than the owner has to operate.

  • 35 to 60 circuits, multi-zone and multi-level
  • Full climate control with per-zone scheduling
  • Shading with wind and rain safety logic
  • Energy metering on the main incomers
  • Operating modes for staff, not just for a family
  • Operator training and a quick-reference card

DEVICES

45 to 80

BUS LINES

2 to 3

SITE TIME

3 to 5 weeks

GROWTH

Coupler and spare capacity per line

Office floor, clinic, warehouse zone, faculty seminar wing, condo common areas KNX installation in Malaysia at RM70,000 - RM100,000
SMALL BUILDING

RM70,000 - RM100,000

Office floor, clinic, warehouse zone, faculty seminar wing, condo common areas

A building, not a home. Several parties use it, somebody is accountable for the electricity bill, and the reporting has to hold up in a management meeting.

  • Zoned lighting with presence and daylight control
  • Central or VRF plant integration and scheduling
  • Sub-metering with allocation by zone or tenant
  • Scheduled access to doors and after-hours rules
  • Monthly exportable energy and occupancy reports
  • Handover pack written for a building team, not an owner

DEVICES

80 to 160

BUS LINES

3 to 5

SITE TIME

5 to 8 weeks

GROWTH

Backbone laid for the floors above

Below RM15,000 we will say no, and we will tell you why rather than take the job. Under that figure the fixed cost of surveying, programming, commissioning and documenting a system properly consumes the whole budget, and the only way to deliver it is to skip one of them. A single room does not need a bus. Come back when the scope is a floor.

Eight Projects, Told Properly

Values are the contracted figures. Names and exact addresses are withheld where clients have asked, which is most of the time. Everything else is as it happened, including the parts that were our idea and the parts that were not in the original brief.

The double-storey terrace that was quoted RM71,000 elsewhere - KNX project in Setia Alam, Selangor
RM24,600 Setia Alam, Selangor 11 days on site

The Double-Storey Terrace That Was Quoted RM71,000 Elsewhere

OWNER-OCCUPIER, RENOVATION

The owner came to us with two quotations. One was RM71,000 for a KNX system in a 22 by 75 ft terrace house. The other was RM9,800 for a bag of Wi-Fi switches and a hub. He had assumed the truth was somewhere in the middle and was mostly trying to work out which one was lying.

Neither was. The RM71,000 quotation had a proper device schedule attached and every line of it was defensible - it was simply drawn from a blank page by a firm whose smallest normal job is a hotel. The design hours alone accounted for more than a third of it. We priced the same house at RM24,600 by starting from a panel block and an addressing schema we had already built and tested ninety times, and by cutting the device count where the function was duplicated rather than where the engineering was.

What actually came out: sixteen dimmed circuits reduced to eleven where two switches were controlling the same visual effect, and a third-floor allowance deleted because there is no third floor. What did not come out: the line was loaded to 60% of capacity, the power supply sized with margin, both ends of every cable labelled, and the handover pack issued in full. Two years later he added the porch and the water feature. That cost him a device and a download.

Circuits
11 dimmed, 9 switched
AC zones
4, with set-back
Integrated
Auto-gate, alarm, main door
Extended since
Yes, twice
A warehouse that stopped lighting empty aisles around the clock - KNX project in Port Klang, Selangor
RM78,500 Port Klang, Selangor 5 weeks, live operations

A Warehouse That Stopped Lighting Empty Aisles Around the Clock

THIRD-PARTY LOGISTICS OPERATOR, 24/7 SITE

A 22-aisle distribution warehouse running three shifts, with every high-bay on a single contactor per bay. The lights never went off because nobody could be sure which aisle a picker was in, and the operator was paying for a fully lit building to serve a handful of forklifts at 3am.

Each aisle became its own zone, with presence detection at both ends and down the aisle, so the high-bays light as a forklift turns in and fall to a safe standby level two minutes after it leaves. The picking faces nearest the roof lights are dimmed against daylight to hold a maintained lux, and the dock lighting follows the booked bay schedule.

We worked one aisle at a time between waves of picking, so the site never stopped shipping. The metering added on the lighting board showed the saving directly in the first month, and the operator now uses the same data to plan which aisles to consolidate at night.

Aisles
22 individual zones
Standby
Safe level, not dark
Dock
Follows booked bays
Shipping lost
None
Two lecture theatres any lecturer can run without a manual - KNX project in Bangi, Selangor
RM62,800 Bangi, Selangor Semester break, 16 days

Two Lecture Theatres Any Lecturer Can Run Without a Manual

UNIVERSITY ESTATES OFFICE, FACULTY OF ENGINEERING

Two 300-seat theatres with a wall of eleven switches each, a blind controller nobody could find and a projector that lecturers routinely left on over the weekend. The faculty had a written complaint from the student council and a fixed budget line that would not survive to the next financial year.

We replaced every wall switch with one plate at the lectern and one at the door. Four scenes: Lecture, Presentation, Exam and Cleaning, each one sequencing the house lights, the stage wash, the blackout blinds and the projector together. Presence detection clears the room forty minutes after the last movement, including the projector.

All of it was done inside the semester break, commissioned with the faculty technician beside us, and handed over with a laminated quick card at each lectern. The same room template has since been cloned into three more theatres by the estates office budget of the following year.

Scenes
4, one lectern plate
Blinds
Sequenced with scene
Idle shutdown
Lights, AC and projector
Cloned since
3 more theatres
A shoplot café that had to keep trading through the whole install - KNX project in George Town, Penang
RM58,300 George Town, Penang 4 weeks, night works

A Shoplot Café That Had to Keep Trading Through the Whole Install

F&B OPERATOR, GROUND FLOOR PLUS STUDIO ABOVE

A conservation-area shoplot: café on the ground floor, a small studio let above, and an operator who could not afford to close for a single lunch service. The brief was ambience the staff could not get wrong, plus an end to the standing argument about who forgot to switch off the signage.

We worked nights and split the job into four releases, each one commissioned and tested before the next began, so the café opened every morning on a working system. Front of house runs four trading scenes on a single recessed plate - open, trade, dinner, close - with the close scene sequenced so the kitchen extract and the display cases drop out in a fixed order. Signage and façade lighting run on an astronomical clock, so nobody forgets anything again. The studio above is a separately metered zone with its own plate and its own tenant rules.

The energy metering was not in the original brief; we added it at RM3,400 because the operator could not tell us what the café cost to run. The first full month of data showed the display chillers holding a load through the closed hours that nobody had accounted for. That finding paid for the metering four times over in the first year, which is roughly the story of every energy meter we have ever installed.

Scenes
4 trading modes
Zones
Café, kitchen, façade, studio
Metering
Separate tenant sub-meter
Downtime
Zero trading days lost
A 1,050 sq ft condominium, three days, no wall hacking - KNX project in Mont Kiara, Kuala Lumpur
RM16,900 Mont Kiara, Kuala Lumpur 3 days on site

A 1,050 sq ft Condominium, Three Days, No Wall Hacking

OWNER-OCCUPIER, OCCUPIED UNIT

An occupied unit with a finished ceiling and an owner who had made it very clear that nobody was cutting the plaster. The requirement was modest and specific: stop leaving the air-conditioning running in an empty bedroom, stop the living room being either fully bright or fully dark, and be able to check the whole unit from the airport.

Wired KNX was out on the ceiling side, so the installation is a hybrid: twisted-pair bus run inside the existing switch loops and the DB where the containment already existed, and KNX RF for the two bedroom points where it did not. Ten circuits, three air-conditioning zones on IR gateways, one blind, five plates. The whole job was surveyed on a Saturday, cabled and programmed across three weekdays, and commissioned before the weekend.

The point of the story is not the price. It is that a RM16,900 system in a condominium later let out still left the owner holding an ETS project file, a labelled DB, a device inventory with warranty dates and a signed test sheet. When she sells that unit, the buyer inherits a system any certified integrator on earth can take over. That is worth considerably more than the difference between us and a hub in a cupboard.

Circuits
10
AC zones
3 via IR gateway
Method
Hybrid TP + KNX RF
Wall hacking
None
An orphaned bungalow system, recovered instead of ripped out - KNX project in Johor Bahru, Johor
RM41,300 Johor Bahru, Johor 6 weeks, phased

An Orphaned Bungalow System, Recovered Instead of Ripped Out

SECOND OWNER, HOUSE BOUGHT WITH THE SYSTEM IN IT

The house was bought with a KNX system already in it and no file, no drawings, no passwords and no installer - the company had wound up. Half the ground floor no longer responded to anything. Two contractors had already quoted to strip it out and start again, at RM120,000 and RM145,000, which is what happens when nobody wants to take responsibility for somebody else's work.

We spent four days on the bus before quoting anything: reading device addresses off the live line, mapping what physically responded to what, opening every DB in the house and photographing it. Eighty-one of the ninety-four devices were healthy certified hardware. The dead zone turned out to be a failed power supply on an unsegmented second line that had been loaded well past sensible - the original fault was a design decision made years earlier, not a device.

The recovery came to RM41,300: a new supply, a line coupler and proper segmentation, thirteen device replacements, a rebuilt and fully documented ETS project, and re-labelling throughout. The owner kept RM79,000 of working hardware that two other firms had written off. He also, for the first time, owns the file.

Devices found
94 on the live bus
Retained
81
Root cause
Unsegmented, overloaded line
Now held
Full ETS project + as-built
A community hall the committee had to be able to run themselves - KNX project in Seremban, Negeri Sembilan
RM88,400 Seremban, Negeri Sembilan 7 weeks

A Community Hall the Committee Had to Be Able to Run Themselves

MANAGEMENT COMMITTEE, VOLUNTEER OPERATORS

A multipurpose hall and adjoining rooms, run by a volunteer committee that changes every two years. Every previous system in the building had failed the same way: it worked until the one person who understood it stopped being on the committee.

So the constraint drove the whole design. The hall has one plate at the entrance with four labelled modes and nothing else - the sound reinforcement, the fans, the lighting levels and the air-conditioning for each mode were argued out with the committee during design and then locked. There is no app requirement to operate the building. There is an app, and no volunteer is ever obliged to open it.

The RM88,400 covers the hall, two meeting rooms, the kitchen, external and car-park lighting on an astronomical clock, and sub-metering so the committee can see what an event actually costs to hold. The handover pack is written for someone with no technical background, and the annual maintenance visit is timed to land just after the committee changes over, so the new chairman meets us in his first month rather than during his first fault.

Operating modes
4, on one plate
Metered
Hall, kitchen, external
Training
Committee + caretaker
Support
Annual visit at handover of office
Eighteen units at a per-unit price a developer could put in a brochure - KNX project in Klang Valley
RM19,200 per unit Klang Valley One template, then 18 replications

Eighteen Units at a Per-Unit Price a Developer Could Put in a Brochure

BOUTIQUE DEVELOPER, LOW-DENSITY BLOCK

A small developer with eighteen units wanted a genuine automation story for the launch and had been told, correctly, that KNX would not work at his price point. It would not have, quoted the usual way: eighteen individually engineered units at typical design rates puts the per-unit figure somewhere no boutique project can absorb.

One unit was engineered, programmed, tested and signed off as the template - that unit carried the real cost. Every unit after it is a replication: its own ETS sub-project, its own serialised device schedule, its own test sheet, but no new design work. The per-unit price landed at RM19,200 and, more usefully for him, it was a number he could commit to in writing before the first slab.

The block was released in three groups of six to follow vacant possession. Each buyer received a per-unit handover pack, and the JMB received the block-level documentation and a maintenance proposal at handover of common property. This is the same method we use on towers. There is no minimum size at which it starts working.

Units
18, phased in 3 releases
Engineered
Once, as a type unit
Per unit
Own ETS sub-project + test sheet
JMB
Block documentation at handover

What a Small Budget Never Buys You Out Of

Every item below survives at RM15,000 exactly as it survives at RM1.5 million. If a quotation you are holding does not name these, it is not cheaper than ours. It is smaller than it appears.

How We Take Cost Out Instead
  • Topology margin. Lines loaded with spare capacity and segmented properly, whatever the device count.
  • Power-supply headroom. Sized with stated margin and calculated, never assumed because the job is small.
  • Labelling and containment. Both ends of every cable, every device, segregated from mains.
  • The ETS project, handed to you. Backed up offsite and yours. A ten-device system with no file is still a black box.
  • Witnessed testing, per circuit. Signed in front of someone. If it was not tested, it was not commissioned.
  • The handover pack and the training. As-built set, device inventory with warranty dates, operating guide, session with whoever runs the building.
  • Certified devices only. No uncertified hardware to hit a number, ever. It is the one shortcut that cannot be undone later.

What People Say to Us in This Band

Usually within the first ten minutes, usually after somebody else has already told them KNX is not for them.

“KNX is for mansions. It is overkill for my house.”

KNX is a protocol, not a price bracket. A ten-device system speaks exactly the same standard as a ten-thousand-device airport, which is the entire point of an open standard. What makes a system expensive is device count and design hours, and both scale down cleanly. The 388 projects we have delivered under RM100,000 are the argument.

“Under RM100,000 you should just buy Wi-Fi smart switches.”

For a rental you are leaving in two years, honestly, sometimes yes. For a home you are wiring once, the comparison is not price against price - it is a closed cloud product with an average commercial life of about four years against an international standard with certified devices from 500 manufacturers and no dependency on any of them still existing. The cost of being wrong is a wall you already closed up.

“A small job means you will send a junior and rush it.”

The opposite, and for a selfish reason. Small systems in this band are our highest-volume work and every one of them is a support liability we carry for years. A rushed commissioning on a RM20,000 house costs us more in return visits than the margin on the job. The same engineer does the ETS work on every project we take, regardless of value.

“We will start cheap and upgrade properly later.”

That is a perfectly good plan, and it is the one we build for - as long as the first phase is engineered for the second. Topology, containment, spare ways and power headroom are laid for the building you might have. Then you fit what the budget covers now. What you must not do is buy a cheap closed system first, because that phase one has to be removed before phase two can start.

“Will you actually turn up for a job this size in two years?”

We hold the ETS project and back it up offsite, so a fault is a diagnosis and not an archaeology exercise, and maintenance contracts in this band start at RM2,880 a year. But the honest answer is stronger than a promise: because it is KNX and because you were handed the file, any certified integrator in Malaysia can take your system over without us. We would rather earn the work than lock you into it.

“Can you match a quotation I already have?”

We will not price-match blind, and we will tell you plainly if a cheaper quotation is a fair deal - it sometimes is. What we will do is read the other proposal against a like-for-like points list and show you exactly where the difference sits: device count, topology margin, programming scope, or documentation. Most of the time the gap is not margin. It is something that was left out and not mentioned.

Start with the Number, Not the Wish List

Tell us the building and the ceiling you have. You get back a written scope that fits under it, a points list you can hand to any other integrator to price like for like, and an honest answer if the budget and the brief do not meet. That answer has been no often enough that we are comfortable giving it.

SITE SURVEY · FIXED WRITTEN SCOPE · NO VARIATION AFTER SIGN-OFF UNLESS YOU CHANGE IT

Questions We Are Asked About This

Can I get a real KNX system for under RM100,000 in Malaysia?

Yes, and it is the single largest part of our record: 388 of 524 commissioned projects were contracted below RM100,000, at a median of about RM38,400. Entry packages for a single condominium unit start at RM15,888, a whole double-storey terrace house typically lands between RM24,000 and RM45,000, and a small commercial floor or community building between RM70,000 and RM100,000. Nothing is removed from the engineering to hit those figures - the topology margin, labelling, ETS project handover, witnessed testing and documentation are identical to a seven-figure job. What changes is device count and design hours, because we work from pre-engineered panel blocks, a fixed group-address schema and a tested logic library instead of drawing every small project from a blank page.

What is the smallest KNX project you will take on?

About RM15,000. Below that, the fixed cost of surveying, programming, commissioning and documenting a system properly consumes the entire budget, and the only way to deliver it is to skip one of those steps - which we will not do. If your scope is a single room, we will tell you it does not need a bus rather than sell you one.

Why do other KNX integrators quote so much more for a small house?

Because a KNX project below RM100,000 carries almost the same design, programming and commissioning overhead as one ten times larger - only the device count is smaller. An integrator whose smallest normal job is a hotel prices that overhead as a fixed cost, which is how a terrace house ends up quoted at RM70,000. We have spent twelve years engineering that overhead down: reusable panel blocks, one addressing standard across every project, a stocked device shortlist and one accountable engineer with no sales or coordination layer in between. The saving comes out of process, never out of the system.

Is a smaller KNX system worse than a larger one?

It is smaller, not weaker - provided nothing was removed from the engineering. The parts that must never be cut are topology margin, power-supply headroom, labelling and containment, the ETS project file handed to you, witnessed per-circuit testing and the handover pack. If a quotation you are comparing does not name those, it is not cheaper than a proper one; it is a smaller scope described as the same thing. Ask any integrator to attach a points list and the two proposals become comparable in minutes.

How much does a KNX system cost in Malaysia?

It scales with the number of controlled points, not with the size of the brochure. A condominium package starts around RM15,888 for lighting, air-conditioning control, app access and smart plates. Link and terrace houses typically land between RM24,000 and RM45,000, boutique offices between RM30,000 and RM50,000, a lecture theatre retrofit between RM28,000 and RM60,000, and a warehouse high-bay zoning package between RM45,000 and RM95,000. Office towers, hotels, factories, campuses and bulk residential rollouts are phased and quoted on measured scope. Whatever the figure, the engineering standard behind it does not change. Most of our work sits below RM100,000 - 388 projects of the 524 on the record - so a budget in that range is our normal day, not an exception we squeeze in.

All Questions

Book a Design Review

Send the drawings, the problem, or just the building type. Peter replies with the right next step: a design-stage review, a site survey, a diagnostic call-out or a scoped quotation. Response within one working day.

Talk to the Engineer Directly

Peter Teh (Teh Hon Kee)

Lead KNX Integrator

Phone / WhatsApp

+6016-531 3713

Based in

Kuala Lumpur · serving all Malaysia

Hours

Mon-Fri 9:00-18:00 · Sat 10:00-15:00

24/7 emergency cover on Gold contracts

Send Your Enquiry

By submitting you agree to be contacted about your enquiry. Your details are not shared with third parties.

Free Consultation

No-obligation site visit & quote within the Klang Valley.

Quick Response

We typically respond within 2-4 hours in business hours.

Detailed Quote

Itemised quotation with device specs within 3-5 days.

Engineer and client reviewing an open distribution board and drawings during a site survey

A design review costs you nothing and usually saves a redesign.

Bring drawings, a photo of the panel, or just the building type.